Wow, I am impressed. Thankyou. Small world!
I am looking at the receipts and I have difficulty distinguishing repair/maintenance from upgrade but I'll run a few things by you. There is an expensive engine overhaul - he had it removed and about 35 different parts were replaced (belts,hoses of all sorts, hose clamps, gasket sets and seals of all sorts, cylinder head work,head studs, Zetec starter, timing component kit, new oil pump) There is a bill from TechStar- were these the parts that eventually went into the engine overhaul? I have no idea!?
"Core-Bareblock Zetec, 4pc Piston set Supertech p4-FZ85-P3 10.6:1 compression ratio, Eagle Forged Chromoly H-Beam connecting rod set focus w Zetec 2.0, stud kit,clevite rod bearing and main bearing Zetec 2.0." There is another charge for a aluminum expansion tank and a new starter
He also purchased a trailer just for the car. Unconditional love in forged aluminum.