Skip - the two bottom nuts holding the bracket in place, I assume holes are drilled and bolts added? In other words these holes/bolts are not already there? Very helpful picture. It is much clearer what needs to be done. Still not sure if my panels are screwed in though. I can always take out the rivets and add screws.